Plastic Waste Management
Separate Note on Progress of PWM under SBM(G) phase II since 2020, Challenges Faced and way Forward for Saturation and Forward Linkages of all Residual Blocks in the District including O&M Arrangement to be Attached.
View PDF
Districts are to fill relevant data in the designated boxes. Colored boxes (with pre filled data) are not to be edited.
Print
ExportToExcel
PART- A
Existing status of Plastic Waste Management Units (PWMUs) / Material Recovery Facilities (MRFs)
Sr.No.
Total no. of blocks in the District/Uts
No. of Rural PWMUs as on 31.12.2025
No. of blocks mapped with Rural PWMUs as on 31.12.2025
No. of blocks having linkage with urban MRF as on 31.12.2025
Total distinct blocks covered with (Rural PWMU + urban MRF) as on 31.12.2025
Total No. of distinct blocks expected to be covered with (Rural PWMU + Urban MRF) as on 31.03.2026
Residual Blocks to be covered in 2026-27
Total no. of PWMUs sending plastic waste for Road Construction
Total no. of PWMUs sending plastic waste for Road Construction
[1]
[2]
[3]
[4]
[5]
[6]
[7]
[8]
[9]
[10]
1
PART-B
PWM Plan 2026-27
Sr.No.
Particulars
Indication
Numbers Planned
Yes/No
Remarks
1
No. of blocks planned in which Rural PWMU will be set up during 2026-27*
-Whether land has been identified for setting up of PWMUs (Yes or No)? -If No, proposed way forward for ensuring land identification and timely completion.
A
Yes
No
2
"No. of blocks planned to be mapped with other Rural PWMUs during 2026-27*
-Whether other Rural PWMUs have been identified for mapping (Yes/No)? If Yes, numbers to be mentioned. -If No, proposed way forward for identifying and mapping with other Rural PWMUs."
B
Yes
No
3
No. of blocks planned to be linked with Urban MRF during 2026-27*
-Whether urban MRF -- wise mapping has been done ? If Yes, numbers to be mentioned. -If No, proposed way forward for ensuring linking with Urban MRF.
C
Yes
No
4
Total No. of Blocks planned to be covered (with Rural PWMU + Urban MRF)
D=A+B+C
NA
NA
5
No. of Vehicles to be purchased for transporting of Waste Plastic from Villages to Rural PWMU/Urban MRF Whether convergence/source of funding for the same has been finalized? (Yes/No) If Yes, mention the source proposed.
NA
Yes
No
*Component-wise details of physical targets and funds requirement/sources to be given in Part-C.
Quarterly plan for PWM for 2026-27
Sr.No.
Q1
Q2
Q3
Q4
Total
1
Quarterly plan for PWM for 2026-27
PART-C
Component-wise details of PWM Plan 2026-27
Components
Funding permissible under SBM-G
Physical Plan
(in number)
Total Funds Required
(Rs. lakh)
Source of Funding
(Rs. in lakh)
Projected requirement of SBM(G) Funds subject to cap in Column (2)
15th FC Funds (Additional)
MGNREGS
Business model/ Private funds
Other source, if any (SFC/ MPLAD/ MLALAD/ CSR, etc. - pl. specify)
[1]
[2]
[3]
[4]
[5]
[6]
[7]
[8]
[9]
Setting up of PWMUs/MRFs
No. of PWMUs/ MRFs
Rs.16 lakhs per block*
No. of Blocks
No. of Vehicle to be purchased for transporting of Waste Plastic from Villages to Rural PWMU/Urban MRF
NA
NA
NA
NA
No. of PWMUs to be linked for usage of waste plastic in Road Construction
NA
NA
NA
NA
NA
NA
NA
No. of PWMUs to be linked with Cement Kiln for Co- processing of waste plastic
NA
NA
NA
NA
NA
NA
NA
O&M of PWMUs/MRFs (Focus on Business Model)
NA
NA
NA
Functionality : Rural PWMUs (Overall)
Sr.No.
Components
Total Numbers upto 31.12.2025
Total Functional upto 31.12.2025
Total Non-functional upto 31.12.2025
Total No. to be functional by 31.03.2026
( including under construction PWMUs and existing non-functional PWMUs to be made functional )
Remarks
( Plan for ensuring functionality of PWMUs in column 5 )
1
2
3
4
5
6
7
1
PWMUs
5
3 newly sanctioned units unnder construction